| MRT thread. | |
|
+14mumuchi HangPC2 atreyudevil standupper Steven 12 marc_zman alphawolf escortburuk superhornet panah hikmat samuraisan yaminz venez yinchet 18 posters |
|
Author | Message |
---|
yinchet Colonel
Posts : 2648 Join date : 10/02/2011
| Subject: Re: MRT thread. Sat 29 Dec 2012, 8:07 pm | |
| | |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Wed 16 Jan 2013, 7:23 am | |
| Credit to Kampung2005 @ LYN Sprint Expressway[You must be registered and logged in to see this image.]Jalan Cheras[You must be registered and logged in to see this image.]Cheras-Kajang highway (7/1/2013)[You must be registered and logged in to see this image.]Official progress update from MRT Corp websiteJanuary 2013[You must be registered and logged in to see this link.]Project map[You must be registered and logged in to see this image.]Northern - Elevated(1) SUNGAI BULOH DEPOTVast worksite: Part of the former Rubber Research Institute land in Sungai Buloh being cleared for the main MRT depot [You must be registered and logged in to see this image.](2) KOTA DAMANSARAConstruction proceeding: Spun pile installation in progress near the future Kota Damansara MRT station. [You must be registered and logged in to see this image.](3) SEKSYEN 16Scenic: Aerial view of construction work going on along the strip of land between the Civil Service Golf Club and the Sprint Highway. [You must be registered and logged in to see this image.](4) SEKSYEN 16Tedious: Two workers hard at work construction a caission pile which are dug manually. [You must be registered and logged in to see this image.]Central - Underground[You must be registered and logged in to see this link.](5) SEMANTAN PORTALTransition point: Aerial view of the Semantan Portal where the MRT alignment moves from being elevated to underground. [You must be registered and logged in to see this image.](6) KL SENTRALStrengthening structures: Steel reinforcement bars being lowered into a trench for the construction of KL Sentral station’s diaphragm wall. [You must be registered and logged in to see this image.](7) PASAR SENIFuture station: The former Klang Bus Station, Plaza Warisan and Bangunan UO site will be the location of the future Pasar Seni MRT station. This station will be fully integrated with the existing Pasar Seni MRT station, seen here at the far end of the site. [You must be registered and logged in to see this image.]( MERDEKAEfficient digger: A machine called a vertical grabber digs trenches as deep as 30m for the construction of diaphragm walls at Merdeka station. [You must be registered and logged in to see this image.](9) BUKIT BINTANGDiversion: Jalan Bukit Bintang is diverted to the front of Bukit Bintang Plaza and Yayasan Selangor to enable construction work for the Bukit Bintang underground MRT station. [You must be registered and logged in to see this image.](10) PASAR RAKYATFuture link: Aerial view of the MRT station construction work in the middle of the future Tun Razak Exchange. [You must be registered and logged in to see this image.](11) COCHRANEDeep excavation: The tunnel boring machine launch shaft being prepared at Cochrane where four tunnel boring machines will be launched. [You must be registered and logged in to see this image.](12) MALURIBusy worksite: The worksite for the Maluri underground station is situated along the busy Jalan Cheras. [You must be registered and logged in to see this image.] | |
|
| |
venez ADMIN
Posts : 17389 Reputation : 581 Join date : 19/04/2010 Age : 46 Location : AFNG
| Subject: Re: MRT thread. Wed 16 Jan 2013, 8:06 am | |
| Woooooo, mmg full swing project nih, mantap2 | |
|
| |
standupper Kehormat MyMil
Posts : 3271 Reputation : 630 Join date : 04/05/2010
| Subject: Re: MRT thread. Wed 16 Jan 2013, 8:16 am | |
| Tuh ler.. kat area aku sana-sini signboard MRT.. takde delay langsung.. umum projek, keluar tender, siap pacak.
Satu perkara kenapa takde mana-mana "NGO" protes projek nie? | |
|
| |
venez ADMIN
Posts : 17389 Reputation : 581 Join date : 19/04/2010 Age : 46 Location : AFNG
| Subject: Re: MRT thread. Wed 16 Jan 2013, 9:58 am | |
| - standupper wrote:
- Tuh ler.. kat area aku sana-sini signboard MRT.. takde delay langsung.. umum projek, keluar tender, siap pacak.
Satu perkara kenapa takde mana-mana "NGO" protes projek nie? projek prasarana nih selalunya org xkan pertikai, mcm mula2 pojek komuter n lrt dulu ramai yg bangkang tapi bila last2 ramai yg setuju.. | |
|
| |
marc_zman MODERATOR
Posts : 16328 Reputation : 611 Join date : 08/06/2010 Location : di atas tanah bekas hutan, paya dan ladang kelapa sawit.. tak tau laaa ntah sapa2 pernah kena tanam kat sini dulu.. kalu ada laa
| Subject: Re: MRT thread. Wed 16 Jan 2013, 10:25 am | |
| sapa kata projek prasarana orang tak akan bangkang? tu dulu tu masa Tun M umum nak buat jambatan pulau pinang tu.. sapa yg dok bangkang?
last2 laaa ni geng2 dia jugak bising nak mintak jambatan no. 2.. mmg spesis tarak tau malu wooo | |
|
| |
venez ADMIN
Posts : 17389 Reputation : 581 Join date : 19/04/2010 Age : 46 Location : AFNG
| Subject: Re: MRT thread. Wed 16 Jan 2013, 10:29 am | |
| - marc_zman wrote:
- sapa kata projek prasarana orang tak akan bangkang? tu dulu tu masa Tun M umum nak buat jambatan pulau pinang tu.. sapa yg dok bangkang?
last2 laaa ni geng2 dia jugak bising nak mintak jambatan no. 2.. mmg spesis tarak tau malu wooo uhuk3 | |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Sun 17 Mar 2013, 5:14 pm | |
| credit to patchay @ skyscrapercity RECAP: Kuala Lumpur All Ready to Drill Beneath Ground! A remarkable journey at a remarkable time - Sep 2010 to Mar 2013. 1. The SBK MRT Line of Kuala Lumpur was first announced at the end of 2010 and went public in 2011. 2. The public responded and civil societies expressed their opinions. Several protests and dozens of lawsuits also happened. 3. Final alignment was finalised. 4. A MRT-initiated corporation and a project delivery partner were also formed. A master regulatory body began streamlining the processes and evaluating future MRT lines. 5. Land acquisition began and site preparation including the construction of temporary power stations and cement producers. A competency college to train engineers were also formed. More than 10,000 new workers were hired. 6. Ground works started by early 2012 as progessively more than 100 contracts were tendered and awarded subsquently. 7. As per Malaysia's orders, the tunnel-boring machines (TBM) started manufacturing in Germany. 8. By end of 2012, the MRT project has finalised its financing packages. The project is estimated to cost more than US$10 billion. 9. By end of 2012, the entire stretch of the MRT Line as well as the depots have begun construction. Several roads in the city were also re-aligned. 10. And by now 2013, we are preparing to drill underground. To be utilised by Siemens' rolling stock, the whole project with length of 51km and 31 stations will begin commercial usage by June 2017. But we hope to finish earlier than that and by then, MRT Line 2 and 3 would have been well-underway as well. [You must be registered and logged in to see this image.] GET READY to drill underground Kuala Lumpur. The first TBM has arrived from Germany for assembly underground and boring is set to begin in May after trials. - Quote :
WORK on the underground portion of the Klang Valley Mass Rapid Transit (KVMRT) is progressing well with the successful lowering and fitting of the cutterhead for the first Tunnel Boring Machine (TBM).
The lowering of the 70tonne cutter- head, with a diametre of 6.7m, took place under a balmy afternoon sky from the ground surface of the Cochrane launch shaft, located near SK Perempuan Jalan Peel, Kuala Lumpur.
[You must be registered and logged in to see this image.]
The operation took an hour to complete even though the vertical distance was only 30m, or roughly the height of an 11-storey building. Viewed from another perspective, the gigantic crane needed close to two minutes just to lower the cutterhead by one metre.
The operation was a delicate one for the crane operator as there was not much space between the first segment of the TBM and the portal’s opening (the cutterhead has to squeeze through this gap without hitting either). At one point during the operation, the front side of the cutterhead passed by the steel portal door with only 0.5cm to spare.
MMC-Gamuda KVMRT (T) Sdn Bhd construction manager Ng Hau Wei said the lowering of the cutterhead was carried out after extensive planning to ensure smooth execution.
“The main part is in the planning, and we have a good team that ensured everything is neat and tidy.”
[You must be registered and logged in to see this image.]
Getting ready: The TBM will start digging into the wall and make its way to the Pasar Rakyat station. Project manager Gus Klados said he was satisfied with the level of competency displayed by the Malaysian team in lowering the cutterhead into the shaft.
“I derive great satisfaction when these men, many of whom worked on the Stormwater Management and Road Tunnel projects a few years ago, carry out their tasks well,” said Klados, who had worked with Ng and many young Malaysian engineers on the SMART project that was completed in 2007.
“The assembly of the TBM is according to schedule. We hope to launch the TBM ahead of schedule but that will depend on other factors,” he added.
When fully assembled, the TBM will be about 200m long.
The assembly and final testing of this TBM will most likely be completed by the end of next month, with boring scheduled to begin early May.
[You must be registered and logged in to see this image.]
The tunnel boring machine launch shaft being prepared at Cochrane where four tunnel boring machines will be launched.
[You must be registered and logged in to see this image.]
Aerial view of construction work going on along the strip of land between the Civil Service Golf Club and the Sprint Highway between Petaling Jaya and Kuala Lumpur.
[You must be registered and logged in to see this image.]
Aerial view of the Semantan Portal where the MRT alignment moves from being elevated to underground.
[You must be registered and logged in to see this image.]
Jalan Bukit Bintang is diverted to the front of Bukit Bintang Plaza and Yayasan Selangor to enable construction work for the Bukit Bintang underground MRT station.
[You must be registered and logged in to see this image.]
| |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Sun 21 Apr 2013, 2:05 pm | |
| picture map and video most of the station [You must be registered and logged in to see this link.] | |
|
| |
HangPC2 Captain
Posts : 936 Reputation : 144 Join date : 22/04/2010 Age : 42 Location : Langkasuka
| Subject: Re: MRT thread. Wed 08 May 2013, 5:56 pm | |
| | |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Thu 09 May 2013, 5:20 pm | |
| | |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Thu 09 May 2013, 5:26 pm | |
| | |
|
| |
yinchet Colonel
Posts : 2648 Reputation : 368 Join date : 10/02/2011 Age : 39 Location : Petaling Jaya
| Subject: Re: MRT thread. Thu 09 May 2013, 5:28 pm | |
| | |
|
| |
mumuchi GLOBAL MODERATOR
Posts : 19551 Reputation : 525 Join date : 05/06/2010 Location : Dulu Tempat Lumba Kuda
| Subject: Re: MRT thread. Thu 09 May 2013, 8:44 pm | |
| | |
|
| |
innocentti GLOBAL MODERATOR
Posts : 3264 Reputation : 140 Join date : 20/04/2010 Age : 40
| Subject: Re: MRT thread. Mon 13 May 2013, 1:24 am | |
| bila nak buat link sampai and around putrajaya ni..huhuhu..kalo wa duduk maluri lagi boleh wa merasa mrt nih.. | |
|
| |
lkick2113 Major
Posts : 1385 Reputation : 92 Join date : 21/04/2010 Location : centre of the earth
| Subject: Re: MRT thread. Mon 13 May 2013, 11:37 am | |
| | |
|
| |
Faceman Captain
Posts : 816 Reputation : 65 Join date : 02/11/2011 Location : Puchong-Beranang-Pedas
| Subject: Re: MRT thread. Tue 14 May 2013, 1:28 am | |
| makin meriah ler public transport,, makin panjang rangkaian MRT n LRT ni,, pastu boleh ler sambung sampai Klang n Putrajaya... menuju KL Greater | |
|
| |
innocentti GLOBAL MODERATOR
Posts : 3264 Reputation : 140 Join date : 20/04/2010 Age : 40
| Subject: Re: MRT thread. Tue 14 May 2013, 8:56 am | |
| kalau nak menuju status negara maju 2020 sistem pengangkutan awam kena class A gak. | |
|
| |
marc_zman MODERATOR
Posts : 16328 Reputation : 611 Join date : 08/06/2010 Location : di atas tanah bekas hutan, paya dan ladang kelapa sawit.. tak tau laaa ntah sapa2 pernah kena tanam kat sini dulu.. kalu ada laa
| Subject: Re: MRT thread. Tue 14 May 2013, 11:31 am | |
| begitu juga dengan mentaliti rakyat negara ni | |
|
| |
yaminz MODERATOR
Posts : 13517 Reputation : 378 Join date : 23/04/2010 Age : 45
| Subject: Re: MRT thread. Tue 14 May 2013, 11:42 am | |
| - marc_zman wrote:
- begitu juga dengan mentaliti rakyat negara ni
kalo mentaliti msh tahap 3rd class... jgnla nak harap faciliti tahap 'A' camne pun akan jadi 'C'... ekekeke | |
|
| |
alphawolf MODERATOR
Posts : 1457 Reputation : 196 Join date : 18/10/2010 Location : "Sitting Elephant"
| Subject: Re: MRT thread. Tue 14 May 2013, 12:11 pm | |
| Kalau ikut pemerhatian aku kat luar metropolis ni, rail transport (LRT) dah A dah.....masa Komuter mula operasi dulu pun A...bas aje yang tak dapat A...tapi tu pun pasal jalan sesak giler.
Tapi tengok stesen MRT KL Sentral tu jauh dari stesen sedia ada le... | |
|
| |
innocentti GLOBAL MODERATOR
Posts : 3264 Reputation : 140 Join date : 20/04/2010 Age : 40
| Subject: Re: MRT thread. Tue 14 May 2013, 12:41 pm | |
| - marc_zman wrote:
- begitu juga dengan mentaliti rakyat negara ni
mentaliti terhadap apa tu? | |
|
| |
grayish88 Civilian
Posts : 15 Reputation : 1 Join date : 13/05/2013 Age : 42 Location : Bandar Sunway
| Subject: Re: MRT thread. Wed 15 May 2013, 9:24 pm | |
| | |
|
| |
samuraisan Major
Posts : 1124 Reputation : 273 Join date : 31/05/2010
| Subject: Re: MRT thread. Thu 16 May 2013, 6:10 am | |
| org kita ni masih kurang ajar taktahu nak Q ....bagilah org kuar dulu ni tak tunggu depan pintu macamana org nak kuar.. lagi satu salah LRT n Monorail iklan banyak kat stesyen tapi nak buat tanda supaya org beratur pun takada..org Malaysia ni susah sikit.. mentaliti kita masih kelas 3..kena orang asing pulak naik abis terlebih langgar jugak macam naik bas kat seberang Bakso dan naik ketepi kat India.. dia yang bagus masa org nak gi keje sama balik keje..sebab displin sikit org keje ofis lepas tu abis...pernah sekali wa nak turun KL Sentral ada pergi tunggu depan pintu dengan Beg gedebak besar baru balik dari jln2 oberC agaknya tapi mentaliti uuhhh.. wa langgar je lepas tu wa ckp BODOH lah ko ni..byk kali dah macam tu.. | |
|
| |
yaminz MODERATOR
Posts : 13517 Reputation : 378 Join date : 23/04/2010 Age : 45
| Subject: Re: MRT thread. Thu 16 May 2013, 8:36 am | |
| - samuraisan wrote:
-
org kita ni masih kurang ajar taktahu nak Q ....bagilah org kuar dulu ni tak tunggu depan pintu macamana org nak kuar..
lagi satu salah LRT n Monorail iklan banyak kat stesyen tapi nak buat tanda supaya org beratur pun takada..org Malaysia ni susah sikit..
mentaliti kita masih kelas 3..kena orang asing pulak naik abis terlebih langgar jugak macam naik bas kat seberang Bakso dan naik ketepi kat India..
dia yang bagus masa org nak gi keje sama balik keje..sebab displin sikit org keje ofis lepas tu abis...pernah sekali wa nak turun KL Sentral ada pergi tunggu depan pintu dengan Beg gedebak besar baru balik dari jln2 oberC agaknya tapi mentaliti uuhhh.. wa langgar je lepas tu wa ckp BODOH lah ko ni..byk kali dah macam tu.. yup agreed bro, da why we still 3 class mentality... kena ubah mentality baru la bole capai Negara Maju... | |
|
| |
alphawolf MODERATOR
Posts : 1457 Reputation : 196 Join date : 18/10/2010 Location : "Sitting Elephant"
| Subject: Re: MRT thread. Thu 16 May 2013, 10:25 am | |
| markings dah ada dah...tapi semua buat donno ajer.... | |
|
| |
Sponsored content
| Subject: Re: MRT thread. | |
| |
|
| |
| MRT thread. | |
|